Menu

Stephan SEYLER

PARIS

En résumé

Mes compétences :
Civil engineering
Contract management
Construction engineering
Computer Skills
Road construction

Entreprises

  • VSL International (Bouygues TP) - Project Manager

    2015 - maintenant New Orbital Highway (Doha / Qatar)
    The New Orbital Highway 3 Contract (NOH3, $1.7bn) is a 56 Km portion of expressway with 5 main interchanges located to the west and south of Doha City.
    Project Manager for VSL that was awarded the Sub-Contracts ($53m) for the precast segmental construction of the interchanges (Pre-casting, Erection and Post-tensioning of the segments) of the Ramps and Main bridges.
  • BOUYGUES Travaux Publics - Construction Manager

    2013 - 2015 BOUYGUES TP: Nîmes / Montpellier Railway bypass CNM (France)
    Construction manager, in charge of the construction of 50 bridges (Overpass and underpass) out of 170 on the Project and global management of all 170 bridges Equipements (Safety barriers, mouvement joints, cladding, etc.) following up on major suppliers and subcontractors and ensure compliance.
    Construction Manager responsible for the construction of the 22km of Noise barriers, including 6000+ piles and fondations, 60000sqm of acoustic screen made of recycled plastic.
  • BOUYGUES Travaux Publics - Construction Manager

    2012 - 2013 BOUYGUES TP: Abidjan - 3ièm Pont HKB (Ivory Coast)
    Construction Manager, assisting project management team to launch the project, Highway Project, 6.6 km of highway (2x2 lanes) with toll and a major 3 levels interchange at its southern end . Defining and managing budgets, planning work, ensure quality and safety. Management of interfaces between the design office, methods, control office, local authorities, suppliers and production team.
  • Bouygues Travaux Publics - Project Manager

    GUYANCOURT 2011 - 2012 BOUYGUES TP: Johannesburg - Gautrain (South Africa)
    Project Manager, in charge of the tunnel remedial works of the section of tunnel between Park Station and Rosebank. 900 meters of treatement area by cementicious injection of the invert slab and seepage treatement of the tunnel lenght , on the project GAUTRAIN.
  • Bouygues Travaux Publics - Quality Manager

    GUYANCOURT 2010 - 2011 BOUYGUES TP: Johannesburg - Gautrain (South Africa)
    Project Quality Manager, monitoring and advising on the performance of the quality management system, producing data and reports on performances, measuring against set indicators. Liaise with other managers and staff throughout the organization to ensure that the QA system is functioning properly. Where appropriate, advise on changes and their implementation and provide training, tools and techniques to enable others to achieve quality.
  • Bouygues Travaux Publics - Construction Manager

    GUYANCOURT 2006 - 2010 BOUYGUES TP: Johannesburg - Gautrain (South Africa)
    Construction manager, design package DP6A linear works as well as Area manager in charge of the Civil Works and equipments on design package DP5, construction of 22 bridges (Overpass and underpass), 3 viaducts, installation of 2,500 ml of noise barriers, 11,7 km of drainage, various civil works structures (75,000 m3 concrete in total), earthworks , on the project GAUTRAIN.
  • Bouygues Travaux Publics - Construction Manager

    GUYANCOURT 2003 - 2006 BOUYGUES TP: Kingston - Hyghway 2000 (Jamaica)
    Construction manager in charge of the Civil Works, Road Works and Highway equipments, construction of 22 Highway bridges (Overpass and underpass), fabrication en paving of 500,000 tons of asphalt, on the project Highway 2000 Jamaica.
  • Bouygues Travaux Publics - Senior Site Engineer

    GUYANCOURT 2000 - 2003 BOUYGUES TP: Rostock - Warnowtunnel (Germany)
    Senior Site Engineer in charge of the construction of the tunnel entrance portals and access ramps East and West, in charge of the construction of 5 Highway bridges, on the project Feste Warnowquerung Rostock.
  • Bouygues Travaux Publics - Site Engineer

    GUYANCOURT 1995 - 2000 DRAGAGES (Bouygues Group): Hong Kong (China)
    98/00 Site Engineer in charge of the excavation of the portal and tunnel excavation 518 mtrs 184 sq.m and 2437 mtrs 107 sq.m single tube tunnel. Concrete lining, invert, partition wall for West Rail way DB350 Tai Lam tunnel.

    97/98 Site Engineer in charge of the erection by crane of precast segment in urban area, under heavy traffic on Hung Hom Bypass project (956 segments).

    95/97 Site Engineer in charge of precast segment erection by crane of the Eastern and Western Approaches, in charge of one shift for the erection of the main bridge with launching girder on Rambler Channel Bridge MTRC 510

Formations

  • ESTP

    Paris 1993 - 1995 Master's Degree in Civil Engineering

Réseau